  • You can view your Myenergi Zappi EV charger basic controls and data on the Myenergi Hub.

    If you would like to update your Myenergi Hub to the latest firmware, some details for how to update this:

    The Myenergi Hub has two buttons. The steps to update the firmware:

    1. Unplug Power to the hub
    2. Press and hold the 'Download' button (right hand side)
    3. Keep pressing the 'Download' button while you plug the power back into the hub
    4. Check the status lights on the Hub – once the Power LED turns yellow, release the button
    5. The Power LED light should be Green and the Server LED light should be white while the firmware is downloading
    6. Once the download is complete the Server LED light will turn green (or blue) again

    Read More

  • If your Zappi EV charger is not pairing with the Myenrgi Hub - a possibility is 'channel' on the Myenergi Hub does not match the channel on the Zappi EV Charger.

    The remedy to try is to change the channel on your Myenergi Hub so it matches your Zappi EV Charger. Typically by default your Zappi EV Charger channel will be set to Channel 1 (A).

    To change the Myenergi Hub Channel firstly:

    Put Hub into Pairing mode

    To put the hub into pairing mode, briefly press the left-hand button (Pair / Channel)

    The Power LED will flash red and one of the other LEDs will be lit to indicate which channel the hub is using. The channel number is written under the LED.

    Next how to Change the channel

    While the hub is in pairing mode (Power LED flashing red), press and hold the left-hand button. The channel LED will cycle through the channels – Blue for channels 1-4 and White for channels 5-8

    Read More

  • If the DNSP requires export limit on each of the individual phases then a single phase smart meter will need to be used on each phase because the three phase smart meter will not do export limitation per phase. Under this scenario please note that you will not be able to set it up as a single system in Fronius Solar.web

    Read More

  • No, it doesn’t manage export limitation per phase. It sums up the value across all the three phases and then adjusts to export limitation

    Read More

  • No, this is not possible because having two smart meters under a single system will lead to an incorrect visualization of the consumption values in Fronius Solar.web. However this is possible when one smart meter is set to feed-in point and the other smart meter is set to consumption path. This configuration is possible only if a combination of Fronius Datamanager 2.0 box and Fronius Datamanager 2.0 card is used.

    Read More

  • Yes, if your export limit is equal to or greater than the other inverter’s output capacity this can be done. Please note: The Fronius Smart Meter will not control the power output of the third-party inverter. For example: If the third-party inverter is 1.5 kW and Fronius inverter is 5 kW and there is only 5 kW allowed to export, then the export limitation value that can be set on the Fronius inverter is 5 kW.

    Read More

  • Using a Fronius Smart Meter it is possible to export limit on the Fronius Symo Hybrid but not on the Fronius Symo inverter because the Fronius Smart Meter will be connected to the Fronius Symo Hybrid inverter, which in turn cannot be daisy chained with the Fronius Symo inverter.

    Read More

  • In case of space constraints in the switch board, rope CT’s can be used. Please note that rope CT’s are voltage reference CT’s, which are smaller than current reference CT’s and can only be used along with the 480VUL Fronius Smart Meter. So, if you have proposed a system with a 50 kA Fronius Smart Meter and you have space constraints in the main switchboard, then you can solve the situation by having a 480V UL Fronius smart meter with rope CT’s.

    Read More

  • Yes, you can use a Fronius Datamanager 2.0 box and connect the Fronius Smart Meter to it. This can then be added as a PV system in Fronius Solar.web to visualise the consumption values.

    Read More

  • If export limit needs to be done on this site across all the phases then a three phase smart meter will need to be used. If the DNSP doesn’t require export limitation on each of the individual phases then it’s better to use a three phase smart meter because it will export limit once considering the total consumption across all the phases added together.

    Read More


1300 86 78 73
Reviews
Products Review Pure-Electric

Product Review Rating

5.0
Based on 80 reviews
Google Review Pure-Electric

Google Review Rating

5.0
Based on 83 reviews
Trustpilot Review Pure-Electric

Trustpilot Rating

5.0
Based on 108 reviews
Wordofmouth Review Pure-Electric

Word of Mouth Rating

5.0
Based on 16 reviews
Facebook Review Pure-Electric

Facebook Rating

5.0
Based on 9 reviews